Following its opening in 2009, this 3,160-student 9-12 facility successfully satisfies the expansion needs of the Hesperia Unified School District. The design of this new 274,771 square foot campus includes facilities to support and encourage learning in arts/crafts, music, science and industrial technology programs. Painstakingly designed with long lasting and sustainable materials ensures maintenance costs will be minimal. The facility’s combination of concrete block and stucco walls with metal roofs add to the aesthetically pleasing High Desert surroundings. While the primary focus is on the education of the students, this new facility provides students with the tools necessary to excel now, and well into the future.
Location: Hesperia, CA 92345
Owner: Hesperia Unified School District
Square Footage: 274,771
Bid Amount: $74,584,000
Construction Duration: 2.1 years
Delivery Method: Design-Bid-Build
Key Design Features:
|
|